PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Storm piping at the 4th floor for the Low Roof Facing East.jpg Storm piping at the 4th floor for the Low Roof Facing West.jpg Welding metal clips at the 1st floor Facing East.jpg Erecting the stone panels at the East Elevation 4.jpg Erecting the stone panels at the East Elevation 5.jpg Erecting the stone panels at the East Elevation 6.jpg Erecting the stone panels at the East Elevation 7.jpg
Previous pageNext page Erecting the stone panels at the East Elevation 5
Erecting the stone panels at the East Elevation 5